Friday, 25 September 2015
Home Stretch?
After some "negotiations" with the Planning office, we seem to finally have landed on something that they can accept. We will now resubmit, followed by a two weeks neighbour consultation period, and then a two week approval process. This is how it looks now.
Sunday, 26 July 2015
Planning Application Submitted
The planning application was submitted 16 July, just under a week after plan, so we are hoping to be able to make up for lost time in subsequent stages. It is now posted on the East Renfrewshire planning office pages. The neighbours have been informed, and they can now submit any objections. Considering that there was planning permission already on the plot, and the new roof is no higher than the previous, we are hopeful that there won't be any problems. We will know more in about two weeks' time.
Monday, 13 July 2015
Friday, 10 July 2015
Design Concept
It is a couple of weeks ago we got the first design concept. We think it matches the brief really well, and there are not many changes in the plans to be submitted imminently.
A First Schedule Plan
Here is a schedule plan for the period up until the actual build starts. Assuming a six month build and four weeks of snagging, this would mean moving in mid-August 2016. This is cutting it fine considering we would like to be in before Imogen starts school, but it takes the time it takes, and we can work around that. Besides, the plan will change multiple times before that - hopefully not too much to the right...
The first major milestone is to submit for planning approval. That should happen Monday - fingers crossed...
I used an online service called Tom's Planner for this. It is free for personal use, and so far seems to work pretty well for what I need.
The first major milestone is to submit for planning approval. That should happen Monday - fingers crossed...
I used an online service called Tom's Planner for this. It is free for personal use, and so far seems to work pretty well for what I need.
Wednesday, 8 July 2015
From Space
Here it is, viewed from space, the field of dreams...
The plot is by my calculations 973 square metres big, which is a little under a quarter of an acre. An acre has the same origin as the Norwegian word "åker", which means a cultivated field. According to Wikipedia an acre was the size of field that could be plowed in one day by one man.
The plot is by my calculations 973 square metres big, which is a little under a quarter of an acre. An acre has the same origin as the Norwegian word "åker", which means a cultivated field. According to Wikipedia an acre was the size of field that could be plowed in one day by one man.
Tuesday, 9 June 2015
Boarded Up
The opening is now boarded up. This is probably the last thing to happen physically on the site for about six months. If all goes to plan then we will break ground some time in December. Until then all progress will be made on paper only...
Monday, 8 June 2015
The Architect's Brief
We met with the architect this morning to discuss the brief. This is the same architect that made the plans that were previously approved by the Planning Office. We liked the original drawings, but we want to make our own mark on it. John Lamb (www.johnlambarchitect.com) is a local architect, and he comes recommended by the references he provided. We also like the designs on his website.
Basically we are asking for a four bedroom house with design elements both Scotland and Norway, to reflect our background. The ground floor will be pretty open-plan, with wooden flooring throughout. The key requirement is to maximise natural light. We also want to take advantage of views over the fields to the north. The house will be insulated to the highest specification, so it should be economical to heat. There will be water-borne underfloor heating, probably from a air-source heat pump. And there will be a basement, of course :-)
John provided an outline schedule a few months ago, which had a duration of approximately fifteen months. Today he indicated it could be as little as twelve. We are certainly hoping to be in by the time that Imogen starts school next autumn. The first steps are to create a new plan, and submit to planning. The plan should be ready within a month or so, and then there is a two month approval process.
Basically we are asking for a four bedroom house with design elements both Scotland and Norway, to reflect our background. The ground floor will be pretty open-plan, with wooden flooring throughout. The key requirement is to maximise natural light. We also want to take advantage of views over the fields to the north. The house will be insulated to the highest specification, so it should be economical to heat. There will be water-borne underfloor heating, probably from a air-source heat pump. And there will be a basement, of course :-)
John provided an outline schedule a few months ago, which had a duration of approximately fifteen months. Today he indicated it could be as little as twelve. We are certainly hoping to be in by the time that Imogen starts school next autumn. The first steps are to create a new plan, and submit to planning. The plan should be ready within a month or so, and then there is a two month approval process.
Sunday, 7 June 2015
It's All About the Base(-ment) II - No Trouble!
Note from the architect:
"The site investigation was carried out this morning and I am pleased to report that we excavated down to 3 metres below the surface and found no rock. The subsoil is good stiff clay. This means that forming a basement should be entirely feasible and that, in the areas of the house where there is no basement, the ground conditions will allow simple straightforward foundations."
So it seems like the basement is a go!
Tomorrow we are meeting the architect to agree on the design brief. Very excited.
"The site investigation was carried out this morning and I am pleased to report that we excavated down to 3 metres below the surface and found no rock. The subsoil is good stiff clay. This means that forming a basement should be entirely feasible and that, in the areas of the house where there is no basement, the ground conditions will allow simple straightforward foundations."
So it seems like the basement is a go!
Tomorrow we are meeting the architect to agree on the design brief. Very excited.
Thursday, 4 June 2015
It's All About the Base(-ment) - part I
It's all go here. Today we have got an opening in the wall so that we have access to the plot. Tomorrow there will be a little digger on-site digging some test pits so we can see if it is possible to have a basement. It's the Norwegian in me - it's gotta be done if it's possible. A colleague asked why we didn't put the "basement" at ground level. The problem is height restrictions, so if we want the space then we have to go down.
Wednesday, 3 June 2015
The Field of Dreams
As of today we are the proud owners of a little field in Busby. Why it took so long we do not know, but it does not matter now - it is ours now. Now we can start for real on the project to build our dream house. Saying that, I doubt any actual building will start during this year, but hopefully I will be wrong about that...
We must have viewed more than fifty houses in the last couple of years, but nothing was quite right. Several of them were quite wrong...
We found this plot late last autumn, but the owner was not selling before he had sold the old house on the adjacent piece of land. We considered buying both, but it did not make sense financially, so we abandoned it. Then the old house sold, and we put in a bid for the plot, which was accepted.
So here we are, all excited and ready to start working with the architect on the design of our dream home...
We must have viewed more than fifty houses in the last couple of years, but nothing was quite right. Several of them were quite wrong...
We found this plot late last autumn, but the owner was not selling before he had sold the old house on the adjacent piece of land. We considered buying both, but it did not make sense financially, so we abandoned it. Then the old house sold, and we put in a bid for the plot, which was accepted.
So here we are, all excited and ready to start working with the architect on the design of our dream home...
Subscribe to: